ATR Seminar 2006
Victorian Rail Safety Legislation
Rail Safety Act 2006
Transport Act 1983
Rail Safety Regulations 2006
Transport Legislation (Further Amendment) Act
2006
RSA Transitional Arrangements Tourist and Heritage
Existing accredited Tourist and Heritage
Organisations have a 3 year transitional period in which to comply with the
requirements of the Victorian Rail Safety Legislation 2006.
However if Rail Safety requirements are met
earlier the Operator is able to seek accreditation under the new regime prior to
1 August 2009.
RSA 2006 Tourist and Heritage
Existing Providers of Rolling Stock
Currently there are
4 Tourist and Heritage AROs accredited as Providers of Rolling Stock
On 1 August 2006
that accreditation will end
PTSV is currently
scheduling exit audits in place of their annual safety audit.
During this exit
audit, on an individual case by case basis the providers will discuss and
determine with PTSV what new status is appropriate:
Rail Infrastructure
Manager (RIM),
Rolling Stock
Operator (RSO),
Rail Contactor or
apply for an
exemption as an operator in a Private Siding.
RSA 2006 Tourist and Heritage
RSO and RIM Exemptions
Tourist and Heritage
Operators may apply to the Director to waive:
both accreditation
(application) and annual fees (Reg 53(2) and 54(2).
monthly reporting
requirements (Reg 47)
Demonstration of
ongoing Risk Management requirements (RSA s.66)
There is NO
EXEMPTION from schedule 2 SMS requirements
RSA Tourist and Heritage
Exemption as an operator in a Private Siding
Requirements:
ό
An SMS as Aligned to Schedule 3 of Rail Safety Regs
ό
Comply with the Safety Duties of an Operator
ό
Outlined in more detail Private Siding Package to
be sent to AROs from PTSV
Exemptions:
r
Schedule 2 SMS Requirements
r
Tourist and Heritage may apply to the Director to
waive:
both accreditation (application) and annual fees
(Reg 53(2) and 54(2).
monthly reporting requirements (Reg 47)
Demonstration of ongoing Risk Management
requirements (RSA s.66)
RSA Transitional Arrangements Tourist and Heritage
After consultation
with representatives of the sector DOI offers the following tailored
assistance, during the 3 year transition phase:
¦
PTSV conduct SMS workshops by end of 2006
¦
PTD provide Risk Management support by end of 2nd
Quarter 2007
¦
Regular DOI and ARO 6 monthly One on One progress
meetings until 1 August 2009.
RSA Transitional Arrangements Tourist and Heritage
a
Adequacy assessments will take place at appropriate and
agreed intervals throughout the 3 year transitional period.
a
Assessment details will be provided during the workshops or
information sessions.
RSA Tourist and Heritage SMS requirements
Strengthened
requirements in the 2006 Rail Safety Regulations centre around the following:
Safety Management
Systems (SMS)
Risk Management
Competency of Rail
Safety Workers
Lead on to Next
presentation
What are the Rail Safety Legislation SMS requirements?